Silk mouth backflow preventer

Model: HS11X-16T
Nominal diameter: DN40 ~ 100mm
Nominal pressure: PN1.0 ~ 1.6MPa
Suitable temperature: 0 ~ 80 ℃ (if necessary, up to 200 ℃)
Flange standard: GB / T17241.6, GB / T9113
Test standards: GB / T 13927, API598
Contact purchase
shared:

First, the product description:
 HS11X-16T silk mouth backflow preventer is to repair the pipeline and power, the tap water is often interrupted, once the power supply is restored, tap water becomes yellow and dirty, it is due to the process of water, from the fire pipe , Unoccupied buildings or water pipes have not yet used the branch of the backwater, rust water back. In order to allow residents to drink clean water, backflow preventer this device can effectively prevent the occurrence of dirty water in the above circumstances, not only ensure the safety of residents drinking water, but also save water resources. According to the introduction of China Building Standard Design Institute, the Ministry of Construction has revised the relevant national standards and installed "backflow preventer" on the building water supply pipelines.  


 Second, the product structure:
 Backflow prevention device is composed of two levels of back-stop system and a drainage pressure relief system. The drainage pressure relief system upper chamber is connected with the inlet end of the first-stage check-back system. 
 The first and second-level check-back system is mainly composed of the valve body, inlet joint, disc, gaskets, springs and so on. 
 Drainage pressure relief system is mainly composed of valve cover, diaphragm, valve core, gaskets, drain, spring, air baffle, etc. The outlet of air baffle must be connected to the drainage pipe network or sewer.


 Third, the working principle:
 Backflow prevention device is added in the secondary checkback system, a drainage pressure relief device, so that even if the secondary check seal at the same time damage, it can also play a role in preventing backflow pollution. Its working principle: 
 1. Normal water supply: 
 a. Clean municipal water from the first-class check-back system through the drain to the second-level check-back system to export water to users, the first-level check-in system to import high-pressure water into the drainage diaphragm Cavity, and the diaphragm under the cavity and the first stage check valve outlet (second stage check valve inlet) communicating, due to its existence of a certain pressure difference ΔP1 = 0.035MPa, pushing the valve flap down, drain closed, backflow preventer Normal water supply; 
 b. When the valve after the pipeline without users, water still. Such as the inlet pressure remains unchanged, there is pressure before and after the drain is still closed, such as the inlet pressure drops, the intermediate chamber and the valve differential pressure ΔP1 ≤ 0.022MPa, then the drainage control spring to open the spool, open the drain Allow the middle chamber to drain, keeping ΔP1 at 0.035 MPa. 
 
 2. seal failure: 
 a. Backflow preventer after the pipe network pressure rises above the valve inlet pressure, such as the second check valve seal intact, high-pressure water will not backflow, the diaphragm up and down to maintain the original pressure Poor, drain closed, no pressure relief. When the second check valve seal leak damage, the second check valve before the pressure increases, resulting in lower diaphragm pressure drop across the drain, drain open, drain pressure relief; this time, such as the first stop Check valve seal damage at the same time, as the second-stage check valve back to the high-pressure water has been decompression, it will not back to the first-class check valve. 
 b. When the valve pressure is higher than the pressure before the valve, such as water pressure continues to decline, the pressure on the diaphragm diaphragm pressure drop, the safety control valve to open the drainage spring drainage regulator drainage. When the inlet pressure drops to zero or negative pressure, the drain opens completely, the water is drained and the air enters the vacuum chamber through the drain to prevent siphon backflow.
 
 3. The valve opening pressure ≤ 0.07MPa, the specification provides in the range of 0.06 ~ 0.1MPa, inlet check valve working pressure is 0.035MPa. 
 
 The main shape and installation size:

Specification DN (mm)

Total length

Inlet and outlet pipe diameter (in)

Drainage pipe diameter (in)

Weight (kg)

DN15

169

1/2

1/2

1.2

DN20

172

3/4

1/2

1.4

DN25

236

1

1/2

3.5

DN32

321

11/4

3/4

7

DN40

321

11/2

3/4

7

DN50

321

2

1

10


主站蜘蛛池模板: 免费观看羞羞视频网站| 国产午夜无码片在线观看网站| 国产寡妇偷人在线观看| 亚洲偷精品国产五月丁香麻豆| 色视频www在线播放国产人成| 国产精品乱码在线观看| 少妇av一区二区三区无码| 亚洲人亚洲精品成人网站入口| 亚洲国产精品无码久久久不卡| 97人妻无码一区| 精精国产xxxx视频在线播放| 欧美人与zoxxxx另类| 黑人巨大精品欧美一区二区| 国产在线精品一区二区在线观看| 国产精品久久国产精品99 gif| 久久精品国亚洲a∨麻豆| 国产精品自在线拍国产| 国产精品美女www爽爽爽视频| 99尹人香蕉国产免费天天| 人妻三级日本香港三级极97| 国产乱码精品一区三上| 麻花传媒68xxx在线观看| 潮喷大喷水系列无码视频| 变态拳头交视频一区二区| 亚洲一区二区三区影院| 激情五月综合色婷婷一区二区| 欧美熟女视频| 乱人伦人成品精国产在线| 国产精品白浆在线观看免费| 国产精品内射后入合集| 亚洲女人的天堂www| 一本久道高清无码视频| 无码一区二区三区亚洲人妻| 无套无码孕妇啪啪| 亚洲高清无码视频网站在线 | 少妇被多人c夜夜爽爽av| 日韩毛片在线视频x| 又粗又硬又黄又爽的免费视频| 亚洲自偷精品视频自拍| 国产精品久久久久久| 又大又粗欧美成人网站|