无码人妻久久久一区二区三区-女人被男人躁得好爽免费视频-国产日韩在线时看高清视频-91娇喘????白丝动漫-久久婷婷五月综合色精品

Silk mouth backflow preventer

Products > Hydraulic control valve > Silk mouth backflow preventer

Silk mouth backflow preventer

Model: HS11X-16T
Nominal diameter: DN40 ~ 100mm
Nominal pressure: PN1.0 ~ 1.6MPa
Suitable temperature: 0 ~ 80 ℃ (if necessary, up to 200 ℃)
Flange standard: GB / T17241.6, GB / T9113
Test standards: GB / T 13927, API598
Contact purchase
shared:

First, the product description:
 HS11X-16T silk mouth backflow preventer is to repair the pipeline and power, the tap water is often interrupted, once the power supply is restored, tap water becomes yellow and dirty, it is due to the process of water, from the fire pipe , Unoccupied buildings or water pipes have not yet used the branch of the backwater, rust water back. In order to allow residents to drink clean water, backflow preventer this device can effectively prevent the occurrence of dirty water in the above circumstances, not only ensure the safety of residents drinking water, but also save water resources. According to the introduction of China Building Standard Design Institute, the Ministry of Construction has revised the relevant national standards and installed "backflow preventer" on the building water supply pipelines.  


 Second, the product structure:
 Backflow prevention device is composed of two levels of back-stop system and a drainage pressure relief system. The drainage pressure relief system upper chamber is connected with the inlet end of the first-stage check-back system. 
 The first and second-level check-back system is mainly composed of the valve body, inlet joint, disc, gaskets, springs and so on. 
 Drainage pressure relief system is mainly composed of valve cover, diaphragm, valve core, gaskets, drain, spring, air baffle, etc. The outlet of air baffle must be connected to the drainage pipe network or sewer.


 Third, the working principle:
 Backflow prevention device is added in the secondary checkback system, a drainage pressure relief device, so that even if the secondary check seal at the same time damage, it can also play a role in preventing backflow pollution. Its working principle: 
 1. Normal water supply: 
 a. Clean municipal water from the first-class check-back system through the drain to the second-level check-back system to export water to users, the first-level check-in system to import high-pressure water into the drainage diaphragm Cavity, and the diaphragm under the cavity and the first stage check valve outlet (second stage check valve inlet) communicating, due to its existence of a certain pressure difference ΔP1 = 0.035MPa, pushing the valve flap down, drain closed, backflow preventer Normal water supply; 
 b. When the valve after the pipeline without users, water still. Such as the inlet pressure remains unchanged, there is pressure before and after the drain is still closed, such as the inlet pressure drops, the intermediate chamber and the valve differential pressure ΔP1 ≤ 0.022MPa, then the drainage control spring to open the spool, open the drain Allow the middle chamber to drain, keeping ΔP1 at 0.035 MPa. 
 
 2. seal failure: 
 a. Backflow preventer after the pipe network pressure rises above the valve inlet pressure, such as the second check valve seal intact, high-pressure water will not backflow, the diaphragm up and down to maintain the original pressure Poor, drain closed, no pressure relief. When the second check valve seal leak damage, the second check valve before the pressure increases, resulting in lower diaphragm pressure drop across the drain, drain open, drain pressure relief; this time, such as the first stop Check valve seal damage at the same time, as the second-stage check valve back to the high-pressure water has been decompression, it will not back to the first-class check valve. 
 b. When the valve pressure is higher than the pressure before the valve, such as water pressure continues to decline, the pressure on the diaphragm diaphragm pressure drop, the safety control valve to open the drainage spring drainage regulator drainage. When the inlet pressure drops to zero or negative pressure, the drain opens completely, the water is drained and the air enters the vacuum chamber through the drain to prevent siphon backflow.
 
 3. The valve opening pressure ≤ 0.07MPa, the specification provides in the range of 0.06 ~ 0.1MPa, inlet check valve working pressure is 0.035MPa. 
 
 The main shape and installation size:

Specification DN (mm)

Total length

Inlet and outlet pipe diameter (in)

Drainage pipe diameter (in)

Weight (kg)

DN15

169

1/2

1/2

1.2

DN20

172

3/4

1/2

1.4

DN25

236

1

1/2

3.5

DN32

321

11/4

3/4

7

DN40

321

11/2

3/4

7

DN50

321

2

1

10


主站蜘蛛池模板: 狠狠色狠狠色综合| 国产aⅴ激情无码久久久无码| 亚洲中文字幕无码久久精品1| 97国语精品自产拍在线观看| 亚州中文字幕无码中文字幕 | 中文字幕在线播放| 日韩精品av一区二区三区| 欧美人与性动交g欧美精器| 在线a视频网站| 成熟丰满熟妇av无码区| 久久欧美国产伦子伦精品| 久9视频这里只有精品8| 国产在线精品一区二区在线看| 中文字幕久久久久人妻| 国产精品青青青在线观看| 午夜福利1000集在线观看| 久久婷婷丁香五月综合五| 中文字幕无码第1页| 97国语精品自产拍在线观看| 又色又爽又黄高潮的免费视频 | 亚洲欧洲成人av每日更新 | 99精品国产在热久久无毒不卡| 亚洲日本va午夜在线电影| 97人妻人人揉人人躁人人 | 欧美伊香蕉久久综合网99| 国产亚洲一区二区手机在线观看 | 国产精品熟女高潮视频| 7777奇米成人狠狠成人影视| 人妻精品人妻无码一区二区三区| 亚洲中文字幕日产乱码高清app| 国产精品国产三级国产an| 国产在线高清理伦片a| 国产大学生粉嫩无套流白浆| 99久久99精品久久久久久| 国产av高清无亚洲| 男人吃奶摸下挵进去啪啪软件| 亚洲精品国产精品乱码不卡| 国产亚洲精久久久久久无码苍井空| 久久久久有精品国产麻豆| 丁香婷婷综合激情五月色| 国产亚洲精品久久久久久久久动漫|