无码人妻久久久一区二区三区-女人被男人躁得好爽免费视频-国产日韩在线时看高清视频-91娇喘????白丝动漫-久久婷婷五月综合色精品

Silk mouth backflow preventer

Products > Hydraulic control valve > Silk mouth backflow preventer

Silk mouth backflow preventer

Model: HS11X-16T
Nominal diameter: DN40 ~ 100mm
Nominal pressure: PN1.0 ~ 1.6MPa
Suitable temperature: 0 ~ 80 ℃ (if necessary, up to 200 ℃)
Flange standard: GB / T17241.6, GB / T9113
Test standards: GB / T 13927, API598
Contact purchase
shared:

First, the product description:
 HS11X-16T silk mouth backflow preventer is to repair the pipeline and power, the tap water is often interrupted, once the power supply is restored, tap water becomes yellow and dirty, it is due to the process of water, from the fire pipe , Unoccupied buildings or water pipes have not yet used the branch of the backwater, rust water back. In order to allow residents to drink clean water, backflow preventer this device can effectively prevent the occurrence of dirty water in the above circumstances, not only ensure the safety of residents drinking water, but also save water resources. According to the introduction of China Building Standard Design Institute, the Ministry of Construction has revised the relevant national standards and installed "backflow preventer" on the building water supply pipelines.  


 Second, the product structure:
 Backflow prevention device is composed of two levels of back-stop system and a drainage pressure relief system. The drainage pressure relief system upper chamber is connected with the inlet end of the first-stage check-back system. 
 The first and second-level check-back system is mainly composed of the valve body, inlet joint, disc, gaskets, springs and so on. 
 Drainage pressure relief system is mainly composed of valve cover, diaphragm, valve core, gaskets, drain, spring, air baffle, etc. The outlet of air baffle must be connected to the drainage pipe network or sewer.


 Third, the working principle:
 Backflow prevention device is added in the secondary checkback system, a drainage pressure relief device, so that even if the secondary check seal at the same time damage, it can also play a role in preventing backflow pollution. Its working principle: 
 1. Normal water supply: 
 a. Clean municipal water from the first-class check-back system through the drain to the second-level check-back system to export water to users, the first-level check-in system to import high-pressure water into the drainage diaphragm Cavity, and the diaphragm under the cavity and the first stage check valve outlet (second stage check valve inlet) communicating, due to its existence of a certain pressure difference ΔP1 = 0.035MPa, pushing the valve flap down, drain closed, backflow preventer Normal water supply; 
 b. When the valve after the pipeline without users, water still. Such as the inlet pressure remains unchanged, there is pressure before and after the drain is still closed, such as the inlet pressure drops, the intermediate chamber and the valve differential pressure ΔP1 ≤ 0.022MPa, then the drainage control spring to open the spool, open the drain Allow the middle chamber to drain, keeping ΔP1 at 0.035 MPa. 
 
 2. seal failure: 
 a. Backflow preventer after the pipe network pressure rises above the valve inlet pressure, such as the second check valve seal intact, high-pressure water will not backflow, the diaphragm up and down to maintain the original pressure Poor, drain closed, no pressure relief. When the second check valve seal leak damage, the second check valve before the pressure increases, resulting in lower diaphragm pressure drop across the drain, drain open, drain pressure relief; this time, such as the first stop Check valve seal damage at the same time, as the second-stage check valve back to the high-pressure water has been decompression, it will not back to the first-class check valve. 
 b. When the valve pressure is higher than the pressure before the valve, such as water pressure continues to decline, the pressure on the diaphragm diaphragm pressure drop, the safety control valve to open the drainage spring drainage regulator drainage. When the inlet pressure drops to zero or negative pressure, the drain opens completely, the water is drained and the air enters the vacuum chamber through the drain to prevent siphon backflow.
 
 3. The valve opening pressure ≤ 0.07MPa, the specification provides in the range of 0.06 ~ 0.1MPa, inlet check valve working pressure is 0.035MPa. 
 
 The main shape and installation size:

Specification DN (mm)

Total length

Inlet and outlet pipe diameter (in)

Drainage pipe diameter (in)

Weight (kg)

DN15

169

1/2

1/2

1.2

DN20

172

3/4

1/2

1.4

DN25

236

1

1/2

3.5

DN32

321

11/4

3/4

7

DN40

321

11/2

3/4

7

DN50

321

2

1

10


主站蜘蛛池模板: 婷婷亚洲久悠悠色悠在线播放| 久久婷婷五月综合色俺也想去| 国产午夜精品理论片小yo奈| 国产精品成年片在线观看| 国产精品亚洲成在人线| 久久精品无码一区二区三区免费| 在线a亚洲v天堂网2019无码| 久久精品九九亚洲精品| 中文国产乱码在线人妻一区二区| 亚洲成人一区二区| 黑人狠狠的挺身进入| 欧美猛少妇色xxxxx猛叫 | 伊人久久大香线蕉亚洲五月天| 国产成人精品一区二区在线小狼| 久久久久99精品成人片牛牛影视 | 少妇三级全黄| 亚洲精华国产精华精华液网站 | 亚洲aⅴ无码成人网站国产| 亚洲aⅴ无码成人网站国产| 国产99久久亚洲综合精品| 国产真实交换配乱婬95视频| 97色伦图区97色伦综合图区 | 欧美性插b在线视频网站| 日本熟妇色xxxxx日本免费看 | 动漫精品中文无码卡通动漫| 久久zyz资源站无码中文动漫| 日本一道一区二区视频| 久久中文字幕av一区二区不卡| 中文字幕在线不卡精品视频99| 国产欧美在线手机视频| 国产欧美日韩精品专区| 99国产精品久久久久久久成人热| 午夜成人亚洲理伦片在线观看 | 国产成人精品s8视频| 无码三级在线看中文字幕完整版| 久久丫免费无码一区二区| 一本大道大臿蕉无码视频| 欧美黑人巨大xxxxx视频| 国产精品福利在线观看无码卡一| 亚洲人成网7777777国产| 99精品国产福久久久久久|